Contact Us

Get In
Touch

Interested in getting to know us or wanting to discuss our vast experience and how it is beneficial in the construction of your next infrastructure project? We answer the call. Literally. Send us an e-mail or give us a call. We enjoy talking with prospective clients.

Business Development / Bids & Tenders:

Chad Maloney, President & Construction Manager:

Ext. 1002

Ryan Maloney, Vice President & Construction Manager:

Ext. 1001

General Email for Sure-Form:

sureform@sureform.ca

2903 121 Ave. NE
Edmonton, AB T6S 1E6

Office Location

Provincial Archives
of Alberta
2003

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. 

Item 2

Item 3

Lake Louise
Visitor Centre
1988/89

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. 

Item 2

Item 3

Government
Facility
Projects

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. 

Coronation Pool

Station 33

Provincial Archives of Alberta

TIMMS Center for the Arts

Wastewater
Treatment
Projects

Sure-Form has decades of experience in the construction of large scale, reinforced concrete structures including water retaining structures. Sure-Form also has experience with lagoons, settling ponds, etc.

Oakmont Lift Station Upgrade

Collingwood Cove Lift Station Upgrade

Lake Louise Wastewater Treatment Facility Upgrade

Recreational Park Building With Water Treatment System

King Street Booster Station

Reservoir & Pump Station Upgrades, Barrhead

BNR Bioreactor Aeration Blower

Utility Water System Rehab

Ardrossan Lift Station

Ardrossan Reservoir & Pumphouse

Fermenter Upgrades

Heating Loop 4 Upgrades

Membrane Treatment Plant

Waste Activated Sludge Facility

Shaftsbury Water Treatment Plant

Filter Building Upgrade

Water
Treatment
Projects

Sure-Form has decades of experience in the construction of large scale, reinforced concrete structures including water retaining structures. Sure-Form also has experience with lagoons, settling ponds, etc.

Oakmont Lift Station Upgrade

Collingwood Cove Lift Station Upgrade

Lake Louise Wastewater Treatment Facility Upgrade

Recreational Park Building With Water Treatment System

King Street Booster Station

Reservoir & Pump Station Upgrades, Barrhead

BNR Bioreactor Aeration Blower

Utility Water System Rehab

Ardrossan Lift Station

Ardrossan Reservoir & Pumphouse

Fermenter Upgrades

Heating Loop 4 Upgrades

Membrane Treatment Plant

Waste Activated Sludge Facility

Shaftsbury Water Treatment Plant

Filter Building Upgrade