Featured Project

Cold Lake
Fish Hatchery
Cold Lake, AB

Owned by the Province of Alberta, the Cold Lake Fish Hatchery produces approximately 65,000 kg of fish annually to support stocking programs in provincial lakes. The facility did not recirculate water and had a substantial energy demand for heating and operation that totaled $1 million per year.

In 2020, Stantec was hired to upgrade the hatchery by implementing a Recirculating Aquaculture System (RAS) and other functional improvements. Completed in November 2023, the project caused a dramatic decrease in environmental waste and energy consumption, saving taxpayers $870,000 per year while Fisheries contribute over $160 million per year to Alberta’s economy.

Provincial Archives
of Alberta
2003

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. 

Item 2

Item 3

Lake Louise
Visitor Centre
1988/89

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. 

Item 2

Item 3

Government
Facility
Projects

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. 

Coronation Pool

Station 33

Provincial Archives of Alberta

TIMMS Center for the Arts

Wastewater
Treatment
Projects

Sure-Form has decades of experience in the construction of large scale, reinforced concrete structures including water retaining structures. Sure-Form also has experience with lagoons, settling ponds, etc.

Oakmont Lift Station Upgrade

Collingwood Cove Lift Station Upgrade

Lake Louise Wastewater Treatment Facility Upgrade

Recreational Park Building With Water Treatment System

King Street Booster Station

Reservoir & Pump Station Upgrades, Barrhead

BNR Bioreactor Aeration Blower

Utility Water System Rehab

Ardrossan Lift Station

Ardrossan Reservoir & Pumphouse

Fermenter Upgrades

Heating Loop 4 Upgrades

Membrane Treatment Plant

Waste Activated Sludge Facility

Shaftsbury Water Treatment Plant

Filter Building Upgrade

Water
Treatment
Projects

Sure-Form has decades of experience in the construction of large scale, reinforced concrete structures including water retaining structures. Sure-Form also has experience with lagoons, settling ponds, etc.

Oakmont Lift Station Upgrade

Collingwood Cove Lift Station Upgrade

Lake Louise Wastewater Treatment Facility Upgrade

Recreational Park Building With Water Treatment System

King Street Booster Station

Reservoir & Pump Station Upgrades, Barrhead

BNR Bioreactor Aeration Blower

Utility Water System Rehab

Ardrossan Lift Station

Ardrossan Reservoir & Pumphouse

Fermenter Upgrades

Heating Loop 4 Upgrades

Membrane Treatment Plant

Waste Activated Sludge Facility

Shaftsbury Water Treatment Plant

Filter Building Upgrade