Featured Project

Water Supply
Upgrades:
Enoch Cree Nation, AB

$12.1 Million

4,000m3 Cast-In-Place Concrete Reservoir

Water Main Installation

3.6km PVC/HDPE Forcemain

820m Trenchless

Case Bore Road & Existing Oil & Gas Right of Ways

Swabbing & Flushing of Existing Water Mains

Multiple Live Tie-Ins